Cooling mood
Check main power supply voltage in range 380 V 430V before start up the system.
Check water level in cooling towers.
Check chilled water pressure of chilled water system.
Start chilled water primary pump 3 nos.01 stand by.
Start chilled water secondary pumps 3nos.01 stand by
Start condenser water pumps 6 Nos. 01 stand by
All cooling tower fan switch turn auto
Start the chiller as per required
Maintain chemical does for the water treatment daily, weekly and monthly basis
AHUs and FCUs switch turn ON
Heating mood
AHUs and FCUs switch turn winter
Check power supply of all heaters turn ON
Air filters of all AHUS clean properly
Check all heater DB work properly
No comments:
Post a Comment